Archive of photographs taken during the pre- and
post-construction phases - higher numbered pages have later photos
|
Navigate Archive Photos Pages:
1 ...
2 ...
3 ...
4 ...
5 ...
6
|
|
|
|
|
Ground levelled off along side
- 26 MAR 07
|
Ground levelled off at front
- 26 MAR 07
|
Through back bedroom window
- 26 MAR 07
|
|
'Click' on any image to see a larger
version
|
|
|
|
Front patio tiled
- 3 APR 07
|
Front gates fitted
- 3 APR 07
|
A/C ducting boxed in
- 8 APR 07
|
|
'Click' on any image to see a larger
version
|
|
|
|
Bathroom ceiling tiles fitted
- 8 APR 07
|
Path foundations laid behind gate
- 21 APR 07
|
Edging tiles at car drive
- 21 APR 07
|
|
'Click' on any image to see a larger
version
|
|
|
|
Front door fitted and glass in windows
- 21 APR 07
|
Concrete edging at back of drive
- 21 APR 07
|
Living-room with front door fitted
- 23 APR 07
|
|
'Click' on any image to see a larger
version
|
|
|
|
Back-door from kitchen fitted
- 23 APR 07
|
Shower-room door fitted
- 23 APR 07
|
Wardrobe doors fitted
- 23 APR 07
|
|
'Click' on any image to see a larger
version
|
|
|
|
Rear patio outside door fitted
- 23 APR 07
|
Kitchen units delivered awaiting installation
- 25 APR 07
|
External rendering at front
- 3 MAY 07
|
|
'Click' on any image to see a larger
version
|
|
|
|
External rendering at side awaited
- 3 MAY 07
|
Front path tiles laid
- 7 MAY 07
|
Side and back walls rendered
- 7 MAY 07
|
|
'Click' on
any image to see a larger version
|
Archive of photographs taken during the construction
phase - higher numbered pages have later photos
|
Navigate Archive Photos Pages:
1 ...
2 ...
3 ...
4 ...
5 ...
6
|
|
To see a selection of images throughout the construction
period as an animated slide-show, click
here
|
|